Courtesy of Jennifer Xu, Keller Williams Realty Atl North 770-509-0700
Experience elevated new construction living with thoughtfully designed, high-end finishes throughout. Situated on nearly half an acre, this home offers a prime location close to top-rated schools—Murdock/Dodgen/Pope—along with nearby East Cobb swim/tennis, East Cobb Park and easy access to I-75. Inside, you’ll find 10’ ceilings on the main level and 9’ ceilings upstairs and in the finished basement, along with 8’ doors on the main floor and rich site-finished hardwoods throughout the main living areas, owner’s suite and upstairs hallway. Energy-efficient Andersen Fibrex windows fill the home with abundant natural light, creating an airy and bright feel. The designer kitchen is equipped with premium Thermador appliances, including a built-in refrigerator, quartz countertops, custom double-stacked cabinetry with soft-close features, a large island, and a walk-in pantry. The open-concept family room is anchored by a 48 wide gas fireplace, creating a warm and modern gathering space. A main-level guest suite is ideal for in-laws. Upstairs, retreat to the luxurious owner’s suite featuring a double tray ceiling and a spacious spa-inspired bath with a freestanding soaking tub, frameless glass shower, and a large walk-in closet. Master and all five secondary bedrooms include en-suite baths, walk-in closets, and separate thermostats for added comfort and privacy. The finished basement offers additional living space with a bedroom, full bath, and wet bar—perfect for guests or entertaining. Additional highlights include a mudroom with built-ins, custom closet systems and shelving, and an EV charging outlet. Energy-efficient features such as Nest thermostats and a tankless water heater help reduce utility costs. Enjoy outdoor living with a welcoming front patio, rear deck, and expansive backyard. Backed by a 1-year builder warranty and a 10-year structural warranty, this home offers both style and peace of mind. The home is currently under construction and is expected to be completed in August/September 2026. Interior photos are from other projects recently built by the same builder and are for illustrative purposes only.
This content last updated on April 14, 2026 3:18PM.
Select the items on the page that you would like to print. This "Print Options" block will not be printed.
| Main Photo | Main Details | Property Description | Property Features |
| Additional Photos | Addtl Photos Size | Location Map | Schools |